IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 312111 Soft Drink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0723 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,900 $23,700 Implemented
AM0723 # 02 Y:2017 02 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,700 $0 Not Implemented
AM0723 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,600 $340 Implemented
AM0723 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,230 $2,500 Implemented
AM0723 # 05 Y:2017 05 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,380 $3,000 Implemented
AM0723 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,260 $3,480 Not Implemented
AM0723 # 07 Y:2017 07 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,200 $0 Implemented
AM0723 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $4,350 Implemented
AM0723 # 09 Y:2017 09 2017 USE SYNTHETIC LUBRICANT $860 $0 Not Implemented
AM0723 # 10 Y:2017 10 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $980 Not Implemented
AM0641 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $81,000 $40,000 Implemented
AM0641 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $45,620 $50,000 Implemented
AM0641 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,894 $31,100 Implemented
AM0641 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $4,800 $1,800 Implemented
AM0641 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $610 Implemented
AM0641 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,580 $500 Implemented
AM0641 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,940 $220 Not Implemented
AM0641 # 08 Y:2013 08 2013 USE SYNTHETIC LUBRICANT $1,980 $0 Not Implemented
OK0840 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,788 $27,500 Not Implemented
OK0840 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $600 Implemented
OK0840 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,413 $1,378 Not Implemented
OK0840 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $0 Implemented
OK0840 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $1,575 Implemented
OK0840 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $8,267 Not Implemented
OK0840 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,885 $7,053 Not Implemented