Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
797
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0044 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,476 | $800 | Implemented |
UU0044 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,070 | $0 | Not Implemented |
UU0044 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,211 | $7,976 | Not Implemented |
GT0750 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,393 | $1,350 | Implemented |
GT0750 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $226 | $400 | Implemented |
GT0750 # 03 Y:2003 | 03 | 2003 | CONTROL PRESSURE ON STEAMER OPERATIONS | $1,680 | $0 | Not Implemented |
GT0750 # 04 Y:2003 | 04 | 2003 | USE SYNTHETIC LUBRICANT | $6,298 | $0 | Implemented |
GT0750 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,058 | $372 | Implemented |
GT0750 # 06 Y:2003 | 06 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,688 | $5,200 | Not Implemented |
GT0750 # 07 Y:2003 | 07 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $35,980 | $15,000 | Not Implemented |
GT0750 # 08 Y:2003 | 08 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,570 | $27,000 | Not Implemented |
GT0750 # 09 Y:2003 | 09 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,768 | $14,000 | Implemented |
SD0309 # 01 Y:2003 | 01 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $33,835 | $30,000 | Not Implemented |
SD0309 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,073 | $600 | Implemented |
SD0309 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $5,128 | $3,024 | Not Implemented |
SD0309 # 04 Y:2003 | 04 | 2003 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,120 | $20,000 | Not Implemented |
SD0309 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,945 | $4,000 | Not Implemented |
SD0309 # 06 Y:2003 | 06 | 2003 | INSTALL SKYLIGHTS | $4,178 | $9,500 | Not Implemented |
SD0309 # 07 Y:2003 | 07 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,955 | $2,263 | Implemented |
SD0309 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,000 | $10,000 | Implemented |
SD0309 # 09 Y:2003 | 09 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,820 | $14,000 | Not Implemented |
SD0309 # 10 Y:2003 | 10 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,200 | $2,500 | Implemented |