IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 312111 Soft Drink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0452 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,616 $17,500 Not Implemented
LE0452 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,984 $45,750 Not Implemented
LE0452 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,671 $115,000 Not Implemented
LE0452 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $155,577 $500,000 Not Implemented
LE0452 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,026 $9,190 Not Implemented
LE0452 # 08 Y:2018 08 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,475 $30,000 Not Implemented
LE0452 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,055 $5,250 Not Implemented
MI0316 # 01 Y:2017 01 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $313,428 $142,400 Not Implemented
MI0316 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,034 $39,216 Implemented
MI0316 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,854 $61,030 Implemented
MI0316 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,732 $1,660 Implemented
MI0316 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,995 $120 Implemented
MI0316 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $10,816 $7,881 Implemented
MI0316 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,887 $4,577 Not Implemented
MI0316 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,115 $18,100 Not Implemented
MI0316 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,991 $2,140 Implemented
MI0316 # 10 Y:2017 10 2017 USE PHOTOCELL CONTROLS $4,891 $4,136 Not Implemented
MI0316 # 11 Y:2017 11 2017 INSTALL OCCUPANCY SENSORS $4,454 $1,280 Implemented
MI0316 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,829 $4,674 Implemented
MI0316 # 13 Y:2017 13 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,011 $654 Implemented
AM0723 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,900 $23,700 Implemented
AM0723 # 02 Y:2017 02 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,700 $0 Not Implemented
AM0723 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,600 $340 Implemented
AM0723 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,230 $2,500 Implemented
AM0723 # 05 Y:2017 05 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,380 $3,000 Implemented