Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0223 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,906 | $7,955 | Not Implemented |
DL0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $490,980 | $10,000 | Not Implemented |
DL0223 # 04 Y:2023 | 04 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $994 | $4,800 | Implemented |
DL0223 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,840 | $2,800 | Not Implemented |
DL0223 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,437 | $1,030 | Implemented |
DL0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,025 | $0 | Implemented |
DL0219 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $10,600 | Implemented |
DL0219 # 09 Y:2023 | 09 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $51,679 | $50,000 | Not Implemented |
DL0219 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,178 | $10,128 | Implemented |
DL0219 # 07 Y:2023 | 07 | 2023 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $2,856 | $16,145 | Not Implemented |
DL0219 # 06 Y:2023 | 06 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,196 | $50,000 | Implemented |
DL0219 # 04 Y:2023 | 04 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,827 | $0 | Implemented |
DL0219 # 03 Y:2023 | 03 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,246 | $4,000 | Not Implemented |
DL0219 # 02 Y:2023 | 02 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $922 | $520 | Not Implemented |
DL0219 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $496 | $0 | Implemented |
DL0024 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $160,536 | $150,000 | Not Implemented |
DL0024 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,200 | $112,000 | Implemented |
DL0024 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $10,800 | $1,200 | Implemented |
DL0024 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,421 | $3,877 | Not Implemented |
DL0024 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,865 | $11,000 | Implemented |
DL0024 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $116,210 | $102,000 | Not Implemented |