IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 312111 Soft Drink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0024 # 02 Y:2008 02 2008 REPLACE BOILER $116,210 $102,000 Not Implemented
DL0024 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,865 $11,000 Implemented
DL0024 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,421 $3,877 Not Implemented
DL0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $10,800 $1,200 Implemented
DL0024 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,200 $112,000 Implemented
DL0024 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $160,536 $150,000 Not Implemented
UA0021 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,835 $0 Implemented
UA0021 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $4,911 Not Implemented
UA0021 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,899 $37,307 Not Implemented
UA0021 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,186 $1,050 Not Implemented
UA0021 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,436 $49,534 Not Implemented
UA0021 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $278 $271 Not Implemented
UA0021 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,002 $986 Implemented
UA0021 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,292 $2,550 Not Implemented
UA0021 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,804 $8,000 Not Implemented
UA0021 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,288 $3,000 Implemented
UA0021 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $12,169 $6,000 Not Implemented
UA0021 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,811 $2,000 Implemented
NC0372 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $10,092 $8,000 Not Implemented
NC0372 # 02 Y:2008 02 2008 COMBINE UTILITY METERS $61,386 $25,000 Not Implemented
NC0372 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $1,636 $1,600 Not Implemented
NC0372 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $255,208 $500,000 Not Implemented
NC0372 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $721 $250 Not Implemented
NC0372 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,090 $50 Not Implemented
NC0372 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $100 Not Implemented