Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0056 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,032 | $1,160 | Not Implemented |
MZ0056 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $4,969 | $950 | Not Implemented |
MZ0056 # 03 Y:2010 | 03 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,784 | $150 | Not Implemented |
MZ0056 # 04 Y:2010 | 04 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,352 | $150 | Not Implemented |
MZ0056 # 05 Y:2010 | 05 | 2010 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,072 | $1,000 | Not Implemented |
MZ0056 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,900 | $0 | Not Implemented |
MZ0056 # 10 Y:2010 | 10 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $113,700 | $100,000 | Not Implemented |
MZ0056 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,237 | $1,300 | Not Implemented |
MZ0056 # 08 Y:2010 | 08 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $99,250 | $80,000 | Not Implemented |
MZ0056 # 07 Y:2010 | 07 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,340 | $800 | Not Implemented |
NC0417 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,220 | $2,500 | Not Implemented |
NC0417 # 05 Y:2010 | 05 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $26,671 | $70,000 | Not Implemented |
NC0417 # 09 Y:2010 | 09 | 2010 | USE PHOTOCELL CONTROLS | $417 | $122 | Not Implemented |
NC0417 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $2,865 | $2,751 | Not Implemented |
NC0417 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $199 | Not Implemented |
NC0417 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,928 | $1,000 | Not Implemented |
NC0417 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $739 | $180 | Not Implemented |
NC0417 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $101,691 | $362,675 | Not Implemented |
NC0417 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,199 | $100 | Implemented |
NC0413 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,066 | $1,000 | Implemented |
NC0413 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $67,233 | $190,000 | Not Implemented |
NC0413 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,796 | $50 | Implemented |
NC0413 # 03 Y:2010 | 03 | 2010 | INSULATE FEEDWATER TANK | $283 | $337 | Implemented |
NC0413 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,881 | $100 | Implemented |
MZ0053 # 07 Y:2010 | 07 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,342 | $1,160 | Implemented |