Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0835 # 14 Y:2012 | 14 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $987 | $240 | Not Implemented |
OK0835 # 11 Y:2012 | 11 | 2012 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $621 | $120 | Implemented |
OK0835 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,937 | $1,000 | Implemented |
OK0835 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,068 | $1,288 | Not Implemented |
OK0835 # 08 Y:2012 | 08 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,097 | $24,155 | Not Implemented |
OK0835 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,139 | $33,990 | Not Implemented |
OK0835 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,902 | $19,520 | Not Implemented |
OK0835 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $5,126 | Not Implemented |
OK0835 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $538 | $3,183 | Implemented |
OK0835 # 03 Y:2012 | 03 | 2012 | REPLACE BOILER | $10,532 | $96,000 | Not Implemented |
OK0835 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,644 | $17,103 | Not Implemented |
OK0835 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,445 | $1,500 | Implemented |
OK0835 # 12 Y:2012 | 12 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $31,425 | $0 | Implemented |
OK0835 # 13 Y:2012 | 13 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,840 | $4,000 | Not Implemented |
SF0420 # 13 Y:2012 | 13 | 2012 | MINIMIZE WATER USAGE | $677 | $0 | Not Implemented |
SF0420 # 01 Y:2012 | 01 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $113,599 | $0 | Not Implemented |
SF0420 # 02 Y:2012 | 02 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $17,363 | $0 | Not Implemented |
SF0420 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,156 | $840 | Implemented |
SF0420 # 04 Y:2012 | 04 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $44,796 | $12,500 | Not Implemented |
SF0420 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $936 | $555 | Implemented |
SF0420 # 06 Y:2012 | 06 | 2012 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,415 | $2,286 | Not Implemented |
SF0420 # 07 Y:2012 | 07 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $13,612 | $13,418 | Not Implemented |
SF0420 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $53,028 | $57,435 | Not Implemented |
SF0420 # 09 Y:2012 | 09 | 2012 | BURN A LESS EXPENSIVE GRADE OF FUEL | $52,423 | $78,900 | Not Implemented |
SF0420 # 10 Y:2012 | 10 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,461 | $9,543 | Not Implemented |