Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2012 |
Principal Product | Carbonated soft drinks |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $5,000,000-$10,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 1,568,160 |
Annual Production | 25,000,000 Pieces |
Production Hrs. Annual | 4,848 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,330,983 | 13,573,195 | kWh | $0.10 |
Electricity Demand | $384,261 | 30,825 | kW-months/year | $12.47 |
Natural Gas | $262,216 | 38,384 | MMBtu | $6.83 |
TOTAL ENERGY COSTS | $2,732,653 | |||
RECOMMENDED SAVINGS* | $459,506 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,092 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $113,599 Cost: - |
$81,681 | 833,485 | $31,918 | 2,560 | - | - | - | - | - | - |
$81,681 833,485 kWh |
$31,918 2,560 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $17,363 Cost: - |
$11,181 | 114,095 | - | - | $6,182 | 905 | - | - | - | - |
$11,181 114,095 kWh |
- - kW-months/year |
$6,182 905 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,156 Cost: $840 |
$6,156 | 54,245 | - | - | - | - | - | - | - | - |
$6,156 54,245 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $44,796 Cost: $12,500 |
$44,796 | 457,100 | - | - | - | - | - | - | - | - |
$44,796 457,100 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $936 Cost: $555 |
- | - | - | - | $936 | 137 | - | - | - | - |
- - kWh |
- - kW-months/year |
$936 137 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $2,415 Cost: $2,286 |
$2,415 | 24,645 | - | - | - | - | - | - | - | - |
$2,415 24,645 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $13,612 Cost: $13,418 |
- | - | - | - | $8,014 | 1,174 | - | - | $5,598 | 996,193 |
- - kWh |
- - kW-months/year |
$8,014 1,174 MMBtu |
- - Tgal |
$5,598 996,193 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $53,028 Cost: $57,435 |
$40,078 | 408,958 | $12,950 | 1,038 | - | - | - | - | - | - |
$40,078 408,958 kWh |
$12,950 1,038 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $52,423 Cost: $78,900 |
- | - | - | - | $52,423 | 7,675 | - | - | - | - |
- - kWh |
- - kW-months/year |
$52,423 7,675 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,461 Cost: $9,543 |
- | - | - | - | $1,461 | 217 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,461 217 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $147,442 Cost: $498,340 |
$107,413 | 1,096,052 | $40,029 | 3,210 | - | - | - | - | - | - |
$107,413 1,096,052 kWh |
$40,029 3,210 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4151 MINIMIZE WATER USAGE |
Savings: $5,598 Cost: - |
- | - | - | - | - | - | $5,598 | 996,083 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,598 996,083 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.4151 MINIMIZE WATER USAGE |
Savings: $677 Cost: - |
- | - | - | - | - | - | $677 | 120,480 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$677 120,480 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $459,506 Cost: $673,817 |
$293,720 | 2,988,580 | $84,897 | 6,808 | $69,016 | 10,108 | $6,275 | 1,116,563 | $5,598 | 996,193 | $293,720 2,988,580 kWh |
$84,897 6,808 kW-months/year |
$69,016 10,108 MMBtu |
$6,275 1,116,563 Tgal |
$5,598 996,193 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,092 Cost: $1,395 |
$6,156 | 54,245 | - | - | $936 | 137 | - | - | - | - | $6,156 54,245 kWh |
- - kW-months/year |
$936 137 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) |