Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 312112 | Bottled Water Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0332 # 02 Y:2018 | 02 | 2018 | MINIMIZE WATER USAGE | $30,000 | $5,400 | Implemented |
MI0332 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,879 | $3,280 | Implemented |
MI0332 # 10 Y:2018 | 10 | 2018 | INSTALL OCCUPANCY SENSORS | $768 | $2,041 | Implemented |
MI0332 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,178 | $480 | Not Implemented |
MI0332 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,047 | $5,203 | Implemented |
MI0332 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,127 | $1,980 | Not Implemented |
MI0332 # 06 Y:2018 | 06 | 2018 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,193 | $568 | Implemented |
MI0332 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,738 | $15,667 | Implemented |
MI0332 # 04 Y:2018 | 04 | 2018 | INCREASE EFFICIENCY OF TRUCKS | $17,850 | $31,926 | Not Implemented |
MI0332 # 03 Y:2018 | 03 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $29,437 | $39,837 | Implemented |
UF0406 # 11 Y:2007 | 11 | 2007 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,744,561 | $5,831 | Not Implemented |
UF0406 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,733 | $6,479 | Not Implemented |
UF0406 # 09 Y:2007 | 09 | 2007 | USE OPTIMUM THICKNESS INSULATION | $7,084 | $1,380 | Implemented |
UF0406 # 08 Y:2007 | 08 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,754 | $22,000 | Not Implemented |
UF0406 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229,959 | $0 | Implemented |
UF0406 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,557 | $714 | Implemented |
UF0406 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $17,857 | $619 | Implemented |
UF0406 # 04 Y:2007 | 04 | 2007 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $6,004 | $399 | Not Implemented |
UF0406 # 03 Y:2007 | 03 | 2007 | INSTALL SET-BACK TIMERS | $6,690 | $625 | Not Implemented |
UF0406 # 02 Y:2007 | 02 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $372 | $289 | Not Implemented |
UF0406 # 01 Y:2007 | 01 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,441 | $253 | Not Implemented |
UF0395 # 12 Y:2007 | 12 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $53,219 | $20,339 | Implemented |
UF0395 # 13 Y:2007 | 13 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $180,645 | $263,004 | Implemented |
UF0395 # 11 Y:2007 | 11 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,271 | $0 | Implemented |
UF0395 # 10 Y:2007 | 10 | 2007 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $77,607 | $31,201 | Implemented |