IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

480

matching recommendations
Reset
NAICS 31212 Breweries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0559 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,884 $14,697 Not Implemented
SD0559 # 05 Y:2018 05 2018 REDUCE EXCESSIVE BOILER BLOWDOWN $8,114 $11,774 Not Implemented
SD0559 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,587 $600 Not Implemented
MA0786 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,650 $11,256 Not Implemented
MA0786 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $10,389 $13,527 Not Implemented
MA0786 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,232 $1,000 Implemented
MA0786 # 04 Y:2018 04 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,126 $500 Not Implemented
MA0786 # 05 Y:2018 05 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $542 $1,820 Not Implemented
MA0786 # 06 Y:2018 06 2018 INSTALL TIMERS AND/OR THERMOSTATS $559 $360 Implemented
OR0696 # 01 Y:2017 01 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $179,573 $3,044 Not Implemented
OR0696 # 02 Y:2017 02 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,265 $37,275 Not Implemented
OR0696 # 03 Y:2017 03 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,365 $5,880 Not Implemented
OR0696 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $10,116 Not Implemented
BS0106 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $275 Implemented
BS0106 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $48 Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
BS0105 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $7,451 $31,180 Not Implemented
BS0105 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $1,020 Implemented
BS0105 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78 $165 Implemented
BS0099 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $83,061 $200,000 Not Implemented
BS0099 # 02 Y:2017 02 2017 ADOPT IN-HOUSE MATERIAL GENERATION $7,623 $60,000 Not Implemented
BS0099 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $866 $2,440 Not Implemented
BS0099 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $789 $144 Not Implemented
BS0099 # 05 Y:2017 05 2017 TREAT AND REUSE RINSE WATERS $773 $7,514 Not Implemented
BS0099 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $456 $7 Not Implemented