Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
480
matching recommendationsNAICS | 31212 | Breweries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0556 # 03 Y:2020 | 03 | 2020 | INSTALL SKYLIGHTS | $2,253 | $4,190 | Implemented |
UF0556 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,675 | $2,955 | Implemented |
UF0556 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,165 | $421 | Implemented |
UF0556 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $905 | $3,206 | Not Implemented |
UA0233 # 01 Y:2020 | 01 | 2020 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $16,058 | $600 | Not Implemented |
UA0233 # 02 Y:2020 | 02 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $848 | $50 | Implemented |
UA0233 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $260 | $1,068 | Implemented |
UA0233 # 04 Y:2020 | 04 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,500 | $20 | Implemented |
UA0233 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $658 | $185 | Implemented |
UA0233 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $830 | Not Implemented |
UA0233 # 07 Y:2020 | 07 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39 | $25 | Not Implemented |
SF0550 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,782 | $1,359 | Implemented |
SF0550 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,259 | $787 | Implemented |
SF0550 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,899 | $4,002 | Implemented |
SF0550 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,809 | $17,557 | Implemented |
SF0550 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,560 | $12,365 | Implemented |
LE0490 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,924 | $40 | Implemented |
LE0490 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,376 | $10,000 | Not Implemented |
LE0490 # 03 Y:2020 | 03 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,008 | $12,000 | Not Implemented |
LE0490 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,370 | $4,000 | Implemented |
LE0490 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,681 | $5,750 | Implemented |
LE0490 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,572 | $60,000 | Implemented |
LE0490 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,005 | $35,000 | Not Implemented |
LE0490 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,133 | $15,000 | Implemented |
UU0158 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $6,933 | $50,000 | Not Implemented |