Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
41
matching recommendationsNAICS | 312120 | Breweries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1815 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $261 | $788 | Not Implemented |
LS1815 # 07 Y:2018 | 07 | 2018 | USE PHOTOCELL CONTROLS | $88 | $225 | Not Implemented |
LS1815 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,427 | $3,000 | Implemented |
LS1815 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15 | $100 | Implemented |
LS1815 # 04 Y:2018 | 04 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $146 | $125 | Implemented |
LS1815 # 01 Y:2018 | 01 | 2018 | PAY UTILITY BILLS ON TIME | $459 | $25 | Implemented |
LS1815 # 02 Y:2018 | 02 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,369 | $350 | Implemented |
LS1815 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $73 | $25 | Implemented |
LS1810 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $358 | $25 | Not Implemented |
LS1810 # 02 Y:2018 | 02 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $880 | $340 | Implemented |
LS1810 # 03 Y:2018 | 03 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $650 | $650 | Not Implemented |
LS1810 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $986 | $1,088 | Implemented |
LS1810 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $37 | $55 | Not Implemented |
LS1810 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $764 | $1,800 | Implemented |
UD0983 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $390 | $50 | Not Implemented |
UD0983 # 08 Y:2018 | 08 | 2018 | USE OPTIMUM TEMPERATURE | $355 | $0 | Implemented |
UD0983 # 02 Y:2018 | 02 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $13,719 | $2,500 | Not Implemented |
UD0983 # 03 Y:2018 | 03 | 2018 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,019 | $4,500 | Not Implemented |
UD0983 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,393 | $6,000 | Not Implemented |
UD0983 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,115 | $0 | Implemented |
UD0983 # 06 Y:2018 | 06 | 2018 | USE OPTIMUM TEMPERATURE | $836 | $0 | Not Implemented |
UD0983 # 07 Y:2018 | 07 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $819 | $1,100 | Implemented |
LS1803 # 01 Y:2018 | 01 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $544 | $220 | Implemented |
LS1803 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $437 | $300 | Not Implemented |
LS1803 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $179 | $156 | Not Implemented |