Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
458
matching recommendationsNAICS | 31213 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0494 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $270 | $0 | Implemented |
SF0494 # 03 Y:2016 | 03 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,772 | $2,510 | Implemented |
SF0494 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,469 | $4,948 | Implemented |
SF0494 # 05 Y:2016 | 05 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,493 | $5,050 | Not Implemented |
SF0494 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $567 | $2,381 | Implemented |
SF0494 # 07 Y:2016 | 07 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,748 | $406,834 | Implemented |
SF0491 # 01 Y:2016 | 01 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,190 | $300 | Not Implemented |
SF0491 # 02 Y:2016 | 02 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,960 | $7,975 | Not Implemented |
SF0491 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,740 | $6,235 | Not Implemented |
SF0491 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,425 | $15,337 | Implemented |
MI0302 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,170 | $29,740 | Implemented |
MI0302 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,840 | $940 | Implemented |
MI0302 # 03 Y:2016 | 03 | 2016 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,045 | $11,648 | Not Implemented |
MI0302 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,652 | $4,744 | Implemented |
MI0302 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,711 | $2,387 | Implemented |
MI0302 # 06 Y:2016 | 06 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,171 | $260 | Not Implemented |
MI0302 # 07 Y:2016 | 07 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,023 | $3,200 | Not Implemented |
MI0302 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,335 | $416 | Implemented |
MI0302 # 09 Y:2016 | 09 | 2016 | AIR CONDITION ONLY SPACE NECESSARY | $1,008 | $160 | Implemented |
MI0302 # 10 Y:2016 | 10 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $521 | $116 | Not Implemented |
SF0488 # 01 Y:2016 | 01 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,980 | $0 | Implemented |
SF0488 # 02 Y:2016 | 02 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,509 | $840 | Implemented |
SF0488 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $6,138 | $882 | Implemented |
SF0488 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $464 | $70 | Not Implemented |
SF0488 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,183 | $1,469 | Implemented |