Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 31213 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0363 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $2,927 | $0 | Implemented |
SF0363 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,754 | $3,506 | Implemented |
SF0363 # 05 Y:2008 | 05 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,481 | $69,656 | Not Implemented |
SF0363 # 02 Y:2008 | 02 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $968 | $1,145 | Implemented |
SF0363 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,525 | $14,831 | Not Implemented |
SF0356 # 07 Y:2008 | 07 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,534 | $10,979 | Not Implemented |
SF0356 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,472 | $80,535 | Implemented |
SF0356 # 10 Y:2008 | 10 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,810 | $36,311 | Not Implemented |
SF0356 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,225 | $40,545 | Implemented |
SF0356 # 08 Y:2008 | 08 | 2008 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,532 | $4,549 | Not Implemented |
SF0356 # 05 Y:2008 | 05 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $17,740 | $26,898 | Implemented |
SF0356 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $2,504 | $3,760 | Not Implemented |
SF0356 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,655 | $6,281 | Implemented |
SF0356 # 02 Y:2008 | 02 | 2008 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $41,503 | $0 | Not Implemented |
SF0356 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,321 | $150 | Not Implemented |
UW0011 # 02 Y:2008 | 02 | 2008 | INSULATE BARE EQUIPMENT | $7,908 | $15,906 | Not Implemented |
UW0011 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $1,476 | $300 | Not Implemented |
UW0011 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,444 | $0 | Not Implemented |
UW0011 # 05 Y:2008 | 05 | 2008 | INSTALL SKYLIGHTS | $5,089 | $26,250 | Not Implemented |
UW0011 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO HEAT WATER | $5,523 | $20,275 | Not Implemented |
UW0011 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $8,882 | $23,870 | Not Implemented |
UW0011 # 03 Y:2008 | 03 | 2008 | SELL COMBUSTIBLE WASTE | $5,774 | $0 | Not Implemented |
SF0354 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $411 | $498 | Not Implemented |
SF0354 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,475 | $1,441 | Not Implemented |
SF0354 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,867 | $1,654 | Implemented |