IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
NAICS 312130 Wineries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0570 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $291 $648 Implemented
SF0570 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,893 $0 Implemented
SF0570 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $71,549 $5,641 Implemented
SF0570 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $149,399 $10,195 Implemented
SF0570 # 11 Y:2021 11 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $179,262 $1,269,472 Implemented
SF0570 # 01 Y:2021 01 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $24,674 $0 Implemented
SF0569 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,279 $6,956 Implemented
SF0569 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $107,546 $722,227 Implemented
SF0569 # 01 Y:2021 01 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,931 $0 Implemented
SF0569 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,693 $9,138 Implemented
SF0569 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $4,698 $3,740 Implemented
SF0569 # 07 Y:2021 07 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $143,550 $77,720 Implemented
SF0569 # 04 Y:2021 04 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,674 $23,650 Implemented
SF0563 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $339 $227 Implemented
SF0563 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,998 $71,975 Implemented
SF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,582 $2,866 Implemented
SF0563 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,879 $17,947 Implemented
SF0534 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,648 $728 Implemented
SF0534 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,765 $14,350 Implemented
SF0534 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,333 $31,340 Implemented
SF0534 # 07 Y:2019 07 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $1,636 Implemented
SU0472 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,355 $47,766 Implemented
SU0472 # 02 Y:2018 02 2018 INSULATE FEEDWATER TANK $1,339 $6,120 Implemented
SU0472 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $4,715 $0 Implemented
SU0472 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,377 $3,200 Implemented