Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
234
matching recommendationsNAICS | 312130 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0461 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,819 | $80,476 | Implemented |
SF0461 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $666 | $50 | Implemented |
SF0450 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,757 | $0 | Implemented |
SF0450 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,693 | $650 | Implemented |
SF0450 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $2,563 | $11,811 | Implemented |
LE0358 # 07 Y:2013 | 07 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $71,337 | $190,000 | Implemented |
LE0358 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,919 | $31,422 | Implemented |
LE0358 # 09 Y:2013 | 09 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,575 | $16,800 | Implemented |
SF0416 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,478 | $0 | Implemented |
SF0416 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,614 | $18,273 | Implemented |
UW0050 # 01 Y:2011 | 01 | 2011 | PAY BILLS ON TIME TO AVOID LATE FEES | $0 | $0 | Implemented |
UW0049 # 02 Y:2011 | 02 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,443 | $7,200 | Implemented |
UW0049 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,756 | $1,300 | Implemented |
SF0392 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $215 | $541 | Implemented |
SF0392 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $533 | $1,128 | Implemented |
SF0392 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,741 | $10,656 | Implemented |
SF0369 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $70 | Implemented |
SF0369 # 02 Y:2009 | 02 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $565 | $60 | Implemented |
SF0369 # 03 Y:2009 | 03 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $15,017 | $14,000 | Implemented |
SF0369 # 04 Y:2009 | 04 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $34,213 | $37,500 | Implemented |
SF0363 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $2,927 | $0 | Implemented |
SF0363 # 02 Y:2008 | 02 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $968 | $1,145 | Implemented |
SF0363 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,754 | $3,506 | Implemented |
SF0356 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,655 | $6,281 | Implemented |
SF0356 # 05 Y:2008 | 05 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $17,740 | $26,898 | Implemented |