IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
NAICS 312130 Wineries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0369 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $565 $60 Implemented
SF0369 # 03 Y:2009 03 2009 UPGRADE CONTROLS ON COMPRESSORS $15,017 $14,000 Implemented
SF0369 # 04 Y:2009 04 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $34,213 $37,500 Implemented
SF0363 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,927 $0 Implemented
SF0363 # 02 Y:2008 02 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $968 $1,145 Implemented
SF0363 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,754 $3,506 Implemented
SF0356 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,655 $6,281 Implemented
SF0356 # 05 Y:2008 05 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $17,740 $26,898 Implemented
SF0356 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,472 $80,535 Implemented
SF0356 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,225 $40,545 Implemented
SF0354 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,405 $150 Implemented
SF0354 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,867 $1,654 Implemented
SF0353 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $2,458 $2,016 Implemented
SF0353 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,877 $118,644 Implemented
SF0353 # 09 Y:2008 09 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,960 $24,943 Implemented
SF0353 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $2,256 $22,235 Implemented
OR0515 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,800 $0 Implemented
OR0515 # 02 Y:2007 02 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,200 $0 Implemented
OR0515 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $14,600 $45,000 Implemented
SU0231 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,090 $0 Implemented
SU0231 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $1,337 $0 Implemented
SU0231 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $8,242 $1,800 Implemented
SU0231 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,758 $823 Implemented
SU0231 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $256 $755 Implemented
SU0231 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $89 $266 Implemented