Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 312130 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0510 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,686 | $504,000 | Not Implemented |
SF0510 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,192 | $3,095 | Implemented |
SF0510 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,454 | $9,120 | Implemented |
SF0510 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,182 | $12,002 | Implemented |
SF0510 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $44,781 | $7,188 | Not Implemented |
SF0510 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $494 | $90 | Implemented |
SF0509 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,893 | $42,428 | Implemented |
SF0509 # 01 Y:2017 | 01 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $2,452 | $0 | Not Implemented |
SF0509 # 02 Y:2017 | 02 | 2017 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $6,821 | $0 | Not Implemented |
SF0509 # 03 Y:2017 | 03 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $17,732 | $2,539 | Implemented |
SF0509 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $140 | Not Implemented |
SF0509 # 05 Y:2017 | 05 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,813 | $10,550 | Implemented |
SF0509 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,416 | $53,848 | Implemented |
SF0509 # 08 Y:2017 | 08 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,625 | $31,216 | Not Implemented |
SF0509 # 09 Y:2017 | 09 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $38,233 | $90,166 | Not Implemented |
SF0507 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $8,398 | $3,902 | Implemented |
SF0507 # 07 Y:2017 | 07 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $54,833 | $312,470 | Implemented |
SF0507 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,369 | $12,526 | Implemented |
SF0507 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116,456 | $172,681 | Implemented |
SF0507 # 03 Y:2017 | 03 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $1,567 | $156 | Implemented |
SF0507 # 02 Y:2017 | 02 | 2017 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,895 | $560 | Implemented |
SF0507 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,318 | $0 | Implemented |
SF0506 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,033 | $4,499 | Implemented |
SF0506 # 01 Y:2017 | 01 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,307 | $0 | Implemented |
SF0506 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,881 | $728 | Implemented |