IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3122 Tobacco Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0230 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,661 $1,618 Implemented
TT0230 # 04 Y:2019 04 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,630 $30,000 Not Implemented
TT0230 # 01 Y:2019 01 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $37,500 $0 Implemented
TT0230 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,000 $6,000 Not Implemented
TT0230 # 06 Y:2019 06 2019 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $2,786 $10,000 Not Implemented
TT0230 # 08 Y:2019 08 2019 INSTALL TIMERS AND/OR THERMOSTATS $289 $20 Implemented
TT0230 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,935 $39,040 Implemented
TT0230 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,238 $3,200 Implemented
TT0218 # 10 Y:2019 10 2019 ELIMINATE/REDUCE AN OPERATION $798 $340 Implemented
TT0218 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $1,202 $2,400 Implemented
TT0218 # 08 Y:2019 08 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,058 $4,500 Not Implemented
TT0218 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,000 $2,000 Implemented
TT0218 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,670 $200 Implemented
TT0218 # 05 Y:2019 05 2019 INCREASE AMOUNT OF CONDENSATE RETURNED $5,090 $15,000 Implemented
TT0218 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $20,301 $8,000 Not Implemented
TT0218 # 03 Y:2019 03 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,902 $30,000 Not Implemented
TT0218 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,004 $2,150 Implemented
TT0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,090 $85,313 Implemented
TT0152 # 08 Y:2015 08 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,434 $18,270 Implemented
TT0152 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,460 $10,150 Implemented
TT0152 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,606 $109 Not Implemented
TT0152 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,838 $1,800 Implemented
TT0152 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,596 $3,734 Not Implemented
TT0152 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $6,816 $2,400 Implemented
TT0152 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $8,575 $15,201 Implemented