Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
28
matching recommendationsNAICS | 3122 | Tobacco Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0552 # 02 Y:2015 | 02 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $174,643 | $100,000 | Not Implemented |
NC0552 # 15 Y:2015 | 15 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,884 | $2,813 | Not Implemented |
NC0552 # 14 Y:2015 | 14 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $20,285 | $42,560 | Implemented |
NC0552 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $320 | Implemented |
NC0552 # 12 Y:2015 | 12 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $165,594 | $3,000 | Implemented |
NC0552 # 11 Y:2015 | 11 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,528 | $150 | Implemented |
NC0552 # 10 Y:2015 | 10 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $105,601 | $192,000 | Not Implemented |
NC0552 # 09 Y:2015 | 09 | 2015 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $67,578 | $150,000 | Not Implemented |
NC0552 # 07 Y:2015 | 07 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $71,338 | $65,000 | Not Implemented |
NC0552 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $99,030 | $1,000 | Implemented |
NC0552 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,960 | $6,000 | Not Implemented |
NC0552 # 04 Y:2015 | 04 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,541 | $30,000 | Not Implemented |
NC0552 # 03 Y:2015 | 03 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $49,347 | $200,000 | Not Implemented |
NC0552 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,792,252 | $500,000 | Not Implemented |
NC0552 # 08 Y:2015 | 08 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $86,285 | $45,000 | Not Implemented |
WV0312 # 13 Y:2005 | 13 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $591 | $130 | Not Implemented |
WV0312 # 10 Y:2005 | 10 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,712 | $824 | Not Implemented |
WV0312 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $1,797 | $2,788 | Implemented |
WV0312 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,210 | $4,800 | Implemented |
WV0312 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,672 | $413 | Not Implemented |
WV0312 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,708 | $250 | Implemented |
WV0312 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,641 | $7,480 | Not Implemented |
WV0312 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,107 | $2,970 | Implemented |
WV0312 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,013 | $9,600 | Not Implemented |
WV0312 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,049 | $18,750 | Implemented |