IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3122 Tobacco Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0552 # 02 Y:2015 02 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $174,643 $100,000 Not Implemented
NC0552 # 15 Y:2015 15 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,884 $2,813 Not Implemented
NC0552 # 14 Y:2015 14 2015 DEVELOP A REPAIR/REPLACE POLICY $20,285 $42,560 Implemented
NC0552 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,081 $320 Implemented
NC0552 # 12 Y:2015 12 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $165,594 $3,000 Implemented
NC0552 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,528 $150 Implemented
NC0552 # 10 Y:2015 10 2015 RECOVER WASTE HEAT FROM EQUIPMENT $105,601 $192,000 Not Implemented
NC0552 # 09 Y:2015 09 2015 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $67,578 $150,000 Not Implemented
NC0552 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $71,338 $65,000 Not Implemented
NC0552 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,030 $1,000 Implemented
NC0552 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,960 $6,000 Not Implemented
NC0552 # 04 Y:2015 04 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,541 $30,000 Not Implemented
NC0552 # 03 Y:2015 03 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,347 $200,000 Not Implemented
NC0552 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,792,252 $500,000 Not Implemented
NC0552 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,285 $45,000 Not Implemented
WV0312 # 13 Y:2005 13 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $591 $130 Not Implemented
WV0312 # 10 Y:2005 10 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,712 $824 Not Implemented
WV0312 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,797 $2,788 Implemented
WV0312 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,210 $4,800 Implemented
WV0312 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $3,672 $413 Not Implemented
WV0312 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,708 $250 Implemented
WV0312 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,641 $7,480 Not Implemented
WV0312 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,107 $2,970 Implemented
WV0312 # 03 Y:2005 03 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,013 $9,600 Not Implemented
WV0312 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,049 $18,750 Implemented