IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
NAICS 3131 Fiber, Yarn, and Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0844 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,869 $5,000 Not Implemented
GT0844 # 14 Y:2007 14 2007 INSTALL OCCUPANCY SENSORS $1,245 $560 Not Implemented
GT0828 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,977 $7,005 Not Implemented
GT0828 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,977 $86,662 Implemented
GT0828 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $350 Implemented
GT0828 # 04 Y:2006 04 2006 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,909 $0 Implemented
GT0828 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,988 $4,909 Not Implemented
GT0824 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $6,700 Implemented
GT0824 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,327 $1,600 Implemented
GT0824 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,767 $9,900 Not Implemented
GT0824 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,205 $1,450 Implemented
GT0824 # 05 Y:2006 05 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,702 $600 Not Implemented
GT0824 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $16,185 $1,320 Not Implemented
GT0824 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,644 $0 Implemented
NC0319 # 01 Y:2005 01 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,809 $2,000 Implemented
NC0319 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $19,522 $27,100 Not Implemented
NC0319 # 03 Y:2005 03 2005 DEVELOP A REPAIR/REPLACE POLICY $4,681 $1,000 Implemented
NC0319 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,753 $0 Implemented
NC0319 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,156 $1,000 Implemented
NC0319 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,604 $0 Implemented
NC0319 # 07 Y:2005 07 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,151 $2,000 Implemented
NC0319 # 08 Y:2005 08 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,126 $0 Implemented
NC0319 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,138 $417 Not Implemented
NC0319 # 10 Y:2005 10 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $933 $300 Implemented
NC0319 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $823 $100 Implemented