IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
NAICS 3131 Fiber, Yarn, and Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0962 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,943 $800 Not Implemented
GT0962 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,117 $13,039 Not Implemented
GT0962 # 01 Y:2023 01 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,691 $200 Not Implemented
GT0962 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,615 $35,774 Not Implemented
GT0962 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $169,075 $2,808,032 Not Implemented
GT0962 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,443 $1,850 Not Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented
GT0900 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $16,527 $106,785 Not Implemented
GT0900 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,890 $180 Implemented
GT0900 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,980 $127,113 Implemented
GT0900 # 04 Y:2017 04 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $42,468 $8,000 Not Implemented
GT0900 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,671 $250 Implemented
GT0870 # 05 Y:2009 05 2009 USE SYNTHETIC LUBRICANT $43,210 $0 Implemented
GT0870 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,910 $45,000 Implemented
GT0870 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $5,810 $620 Implemented
GT0870 # 06 Y:2009 06 2009 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $1,500 $6,399 Implemented
GT0870 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,570 $1,000 Not Implemented
GT0870 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,245 $20,050 Implemented
GT0870 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,796 $7,656 Not Implemented
GT0870 # 01 Y:2009 01 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $625 $0 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0867 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,318 $89,971 Not Implemented
GT0867 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,949 $0 Not Implemented
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented