Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3132 Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2310 # 06 Y:2023 06 2023 UPGRADE OBSOLETE EQUIPMENT $8,217 $52,431 Implemented
KS2310 # 01 Y:2023 01 2023 USE OPTIMUM THICKNESS INSULATION $6,101 $3,005 Implemented
KS2202 # 10 Y:2022 10 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $270 $490 Implemented
KS2202 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,832 $7,155 Implemented
KS2202 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,798 $10,051 Implemented
KS2202 # 06 Y:2022 06 2022 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,883 $4,387 Implemented
KS2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,104 $45 Implemented
KS2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,120 $5,480 Implemented
GT0842 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $5,980 $1,603 Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0819 # 05 Y:2006 05 2006 USE EXISTING DAM TO GENERATE ELECTRICITY $106,850 $94,000 Implemented
GT0819 # 04 Y:2006 04 2006 DISCONNECT BALLASTS $2,735 $3,678 Implemented
GT0819 # 03 Y:2006 03 2006 UPGRADE CONTROLS ON COMPRESSORS $18,798 $5,000 Implemented
GT0819 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,030 $4,800 Implemented
GT0819 # 01 Y:2006 01 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $140,000 $10,000 Implemented
GT0767 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $15,699 $2,088 Implemented
GT0767 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $1,250 Implemented
GT0767 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,362 $100 Implemented
GT0766 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,869 $500 Implemented
GT0766 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,589 $49,906 Implemented
GT0766 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $5,000 $1,000 Implemented
GT0766 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,159 $6,250 Implemented