Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
376
matching recommendationsNAICS | 3133 | Textile and Fabric Finishing and Fabric Coating Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2506 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,703 | $514,800 | n/a |
LS2506 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $135 | n/a |
LS2506 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,849 | $20,250 | n/a |
LS2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $9,990 | n/a |
LS2506 # 06 Y:2025 | 06 | 2025 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $3,451 | $15,964 | n/a |
LS2506 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,930 | $80,003 | n/a |
LS2506 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $50 | n/a |
LS2506 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $4,511 | $500 | n/a |
KS2434 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $2,723 | $1,383 | n/a |
KS2434 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $48,853 | $469,862 | n/a |
KS2434 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,772 | $52,090 | n/a |
KS2434 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,889 | $6,569 | n/a |
KS2434 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,537 | $6,440 | n/a |
KS2434 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,512 | $73,720 | n/a |
SU0556 # 11 Y:2024 | 11 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $7,286 | $4,767 | Implemented |
SU0556 # 10 Y:2024 | 10 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $18,784 | $12,106 | Implemented |
SU0556 # 09 Y:2024 | 09 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $998 | $553 | Implemented |
SU0556 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,128 | $993 | Implemented |
SU0556 # 14 Y:2024 | 14 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $402 | $537 | Implemented |
SU0556 # 15 Y:2024 | 15 | 2024 | INSTALL OCCUPANCY SENSORS | $557 | $1,283 | Implemented |
SU0556 # 16 Y:2024 | 16 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,480 | $25,942 | Not Implemented |
SU0556 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,492 | $63 | Implemented |
SU0556 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,127 | $0 | Implemented |
SU0556 # 02 Y:2024 | 02 | 2024 | DISCONNECT BALLASTS | $1,105 | $0 | Implemented |
SU0556 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,272 | $0 | Implemented |