IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

362

matching recommendations
Reset
NAICS 3133 Textile and Fabric Finishing and Fabric Coating Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0550 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $526,998 $1,348,560 Not Implemented
NC0589 # 05 Y:2017 05 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,593 $10,750 Not Implemented
NC0589 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $100 Implemented
NC0589 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $300 Implemented
NC0589 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,155 $66,186 Implemented
NC0589 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,357 $1,000 Implemented
NC0589 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,876 $840 Implemented
NC0589 # 04 Y:2017 04 2017 IMPROVE SPACE COMFORT CONDITIONING $28,966 $135,750 Not Implemented
NC0589 # 03 Y:2017 03 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,455 $10,000 Not Implemented
NC0589 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,080 $19,100 Not Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented
MI0307 # 14 Y:2017 14 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $359 $40 Implemented
MI0307 # 13 Y:2017 13 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $692 $240 Implemented
MI0307 # 12 Y:2017 12 2017 USE PHOTOCELL CONTROLS $840 $600 Not Implemented
MI0307 # 11 Y:2017 11 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $845 $1,450 Not Implemented
MI0307 # 10 Y:2017 10 2017 CONVERT FROM BATCH TO CONTINUOUS OPERATION $1,137 $800 Not Implemented
MI0307 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,516 $8,584 Not Implemented
MI0307 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,536 $3,370 Implemented
MI0307 # 07 Y:2017 07 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,323 $1,720 Implemented
MI0307 # 06 Y:2017 06 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,403 $842 Not Implemented
MI0307 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $2,611 $6,150 Not Implemented
MI0307 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,347 $1,660 Implemented
MI0307 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,777 $23,135 Implemented
MI0307 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,877 $56,000 Not Implemented
MI0307 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $12,345 $3,600 Implemented