Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
362
matching recommendationsNAICS | 3133 | Textile and Fabric Finishing and Fabric Coating Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0550 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $526,998 | $1,348,560 | Not Implemented |
NC0589 # 05 Y:2017 | 05 | 2017 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,593 | $10,750 | Not Implemented |
NC0589 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
NC0589 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $541 | $300 | Implemented |
NC0589 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,155 | $66,186 | Implemented |
NC0589 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,357 | $1,000 | Implemented |
NC0589 # 06 Y:2017 | 06 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,876 | $840 | Implemented |
NC0589 # 04 Y:2017 | 04 | 2017 | IMPROVE SPACE COMFORT CONDITIONING | $28,966 | $135,750 | Not Implemented |
NC0589 # 03 Y:2017 | 03 | 2017 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,455 | $10,000 | Not Implemented |
NC0589 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,080 | $19,100 | Not Implemented |
NC0589 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,378 | $62,575 | Not Implemented |
MI0307 # 14 Y:2017 | 14 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $359 | $40 | Implemented |
MI0307 # 13 Y:2017 | 13 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $692 | $240 | Implemented |
MI0307 # 12 Y:2017 | 12 | 2017 | USE PHOTOCELL CONTROLS | $840 | $600 | Not Implemented |
MI0307 # 11 Y:2017 | 11 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $845 | $1,450 | Not Implemented |
MI0307 # 10 Y:2017 | 10 | 2017 | CONVERT FROM BATCH TO CONTINUOUS OPERATION | $1,137 | $800 | Not Implemented |
MI0307 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,516 | $8,584 | Not Implemented |
MI0307 # 08 Y:2017 | 08 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,536 | $3,370 | Implemented |
MI0307 # 07 Y:2017 | 07 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,323 | $1,720 | Implemented |
MI0307 # 06 Y:2017 | 06 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,403 | $842 | Not Implemented |
MI0307 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $2,611 | $6,150 | Not Implemented |
MI0307 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,347 | $1,660 | Implemented |
MI0307 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,777 | $23,135 | Implemented |
MI0307 # 02 Y:2017 | 02 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,877 | $56,000 | Not Implemented |
MI0307 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,345 | $3,600 | Implemented |