Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsNAICS | 3133 | Textile and Fabric Finishing and Fabric Coating Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2434 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,772 | $52,090 | n/a |
KS2434 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,889 | $6,569 | n/a |
KS2434 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,537 | $6,440 | n/a |
KS2434 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,512 | $73,720 | n/a |
KS2434 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $48,853 | $469,862 | n/a |
KS2434 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $2,723 | $1,383 | n/a |
NC0658 # 04 Y:2020 | 04 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $92,941 | $500 | n/a |
NC0658 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $5,000 | n/a |
NC0658 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $400 | n/a |
NC0658 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,055 | $3,000 | n/a |
NC0658 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,952 | $4,258 | n/a |
NC0658 # 02 Y:2020 | 02 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,051 | $15,000 | n/a |
NC0589 # 05 Y:2017 | 05 | 2017 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,593 | $10,750 | Not Implemented |
NC0589 # 06 Y:2017 | 06 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,876 | $840 | Implemented |
NC0589 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,378 | $62,575 | Not Implemented |
NC0589 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,155 | $66,186 | Implemented |
NC0589 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $541 | $300 | Implemented |
NC0589 # 03 Y:2017 | 03 | 2017 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,455 | $10,000 | Not Implemented |
NC0589 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
NC0589 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,080 | $19,100 | Not Implemented |
NC0589 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,357 | $1,000 | Implemented |
NC0589 # 04 Y:2017 | 04 | 2017 | IMPROVE SPACE COMFORT CONDITIONING | $28,966 | $135,750 | Not Implemented |
NC0585 # 11 Y:2017 | 11 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,207 | $100 | Implemented |
NC0585 # 10 Y:2017 | 10 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $286 | $100 | Implemented |
NC0585 # 05 Y:2017 | 05 | 2017 | DISCONNECT BALLASTS | $307 | $225 | Implemented |