Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 3133 | Textile and Fabric Finishing and Fabric Coating Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0658 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $400 | n/a |
NC0658 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,952 | $4,258 | n/a |
NC0658 # 04 Y:2020 | 04 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $92,941 | $500 | n/a |
NC0658 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $5,000 | n/a |
NC0658 # 02 Y:2020 | 02 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,051 | $15,000 | n/a |
NC0658 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,055 | $3,000 | n/a |
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |
MA0821 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $997 | $1,400 | Not Implemented |
MA0821 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $23,275 | Not Implemented |
MA0821 # 01 Y:2020 | 01 | 2020 | USE MINIMUM SAFE OVEN VENTILATION | $48,924 | $61,470 | Not Implemented |
LE0487 # 11 Y:2020 | 11 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,929 | $30,000 | Implemented |
LE0487 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $728 | $40 | Implemented |
LE0487 # 10 Y:2020 | 10 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,832 | $8,000 | Implemented |
LE0487 # 09 Y:2020 | 09 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,451 | $15,000 | Implemented |
LE0487 # 08 Y:2020 | 08 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,628 | $85,000 | Not Implemented |
LE0487 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $16,552 | Implemented |
LE0487 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $399 | $975 | Implemented |
LE0487 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,823 | $10,000 | Implemented |
LE0487 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,594 | $10,000 | Not Implemented |
LE0487 # 03 Y:2020 | 03 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $11,267 | $5,000 | Implemented |
LE0487 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $5,562 | $1,833 | Implemented |