IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
NAICS 31331 Textile and Fabric Finishing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS033 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,450 Not Implemented
GT0889 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,925 $1,000 Not Implemented
GT0889 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $14,795 $8,500 Not Implemented
GT0889 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $4,743 $3,920 Not Implemented
GT0889 # 04 Y:2012 04 2012 REDUCE EXCESS STEAM BLEEDING $19,253 $45,075 Not Implemented
GT0889 # 05 Y:2012 05 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $24,926 $6,000 Not Implemented
DL0052 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $143,000 $81,500 Not Implemented
DL0052 # 02 Y:2010 02 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $53,946 $10,848 Not Implemented
DL0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,100 $24,000 Not Implemented
DL0052 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,250 $9,000 Implemented
DL0052 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,940 $1,500 Implemented
DL0052 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $720 Implemented
DL0052 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,560 $200 Implemented
DL0052 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,810 $560 Implemented
DL0052 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $1,019 Implemented
DL0052 # 10 Y:2010 10 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,106 $495 Not Implemented
DL0052 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $310 $585 Not Implemented
MA0653 # 01 Y:2009 01 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $110,550 $270,000 Not Implemented
MA0653 # 02 Y:2009 02 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $37,210 $68,000 Not Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 04 Y:2009 04 2009 CLOSE OFF UNNEEDED STEAM LINES $3,551 $500 Not Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
MA0653 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $6,125 Not Implemented
LE0291 # 01 Y:2009 01 2009 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $32,078 $50,000 Not Implemented
LE0291 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,489 $510 Not Implemented