IAC Assessment: NC0499
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0499
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Dyed and finished fabrics
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2262 - Finishing Plants, Manmade
Sales $50,000,000-$100,000,000
# of Employees 165
Plant Area (Sq.Ft.) 459,000
Annual Production 49,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $469,077 11,283,000 kWh $0.04
Electricity Demand $268,453 26,040 kW-months/year $10.31
Electricity Fees $940 - $ -
Natural Gas $1,107,871 233,267 MMBtu $4.75
TOTAL ENERGY COSTS $2,738,408
RECOMMENDED SAVINGS* $123,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,196
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$52,036
Cost:
$15,000
- - - - $52,036 11,079 - - - - - - -
-
kWh
-
-
kW-months/year
$52,036
11,079
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$17,607
Cost:
$1,000
- - - - $17,607 3,939 - - - - - - -
-
kWh
-
-
kW-months/year
$17,607
3,939
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,043
Cost:
-
- - - - $11,043 2,351 - - - - - - -
-
kWh
-
-
kW-months/year
$11,043
2,351
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$10,670
Cost:
$35,000
- - - - $10,270 2,187 $400 79,920 - - - - -
-
kWh
-
-
kW-months/year
$10,270
2,187
MMBtu
$400
79,920
Tgal
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,164
Cost:
$1,617
- - - - $3,164 674 - - - - - - -
-
kWh
-
-
kW-months/year
$3,164
674
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,539
Cost:
$1,165
- - - - $1,539 328 - - - - - - -
-
kWh
-
-
kW-months/year
$1,539
328
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,306
Cost:
$1,750
- - - - $1,306 278 - - - - - - -
-
kWh
-
-
kW-months/year
$1,306
278
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,104
Cost:
$200
$2,793 - $2,311 256 - - - - - - - - $2,793
-
kWh
$2,311
256
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,448
Cost:
$18,119
$6,134 147,449 $2,224 246 - - - - - - $90 - $6,134
147,449
kWh
$2,224
246
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$90
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,040
Cost:
$12,800
$2,232 53,654 $808 89 - - - - - - - - $2,232
53,654
kWh
$808
89
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,113
Cost:
$3,202
$3,113 74,833 - - - - - - - - - - $3,113
74,833
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,194
Cost:
$451
$729 17,528 $217 24 - - - - - - $1,248 - $729
17,528
kWh
$217
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$1,248
-
$
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,510
Cost:
$100
$2,459 59,112 $891 99 - - - - $(-600) - $(-240) - $2,459
59,112
kWh
$891
99
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-240)
-
$
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,055
Cost:
$4,256
$1,509 36,266 $546 60 - - - - - - - - $1,509
36,266
kWh
$546
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$123,829
Cost:
$94,660
$18,969 388,842 $6,997 774 $96,965 20,836 $400 79,920 $(-600) - $1,098 - $18,969
388,842
kWh
$6,997
774
kW-months/year
$96,965
20,836
MMBtu
$400
79,920
Tgal
$(-600)
-
$
$1,098
-
$
TOTAL IMPLEMENTED Savings:
$89,196
Cost:
$53,476
$13,063 314,009 $4,686 518 $70,949 15,296 - - $(-600) - $1,098 - $13,063
314,009
kWh
$4,686
518
kW-months/year
$70,949
15,296
MMBtu
-
-
Tgal
$(-600)
-
$
$1,098
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost