IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
NAICS 313310 Textile and Fabric Finishing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0585 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,830 $5,000 Implemented
NC0585 # 02 Y:2017 02 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,291 $100 Implemented
NC0585 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,989 $500 Implemented
MA0766 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,264 $57,500 Not Implemented
MA0766 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $50,500 Implemented
MA0766 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,571 $1,000 Not Implemented
MA0766 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,247 $8,325 Not Implemented
MA0766 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,855 $2,000 Implemented
MA0766 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $3,894 $2,462 Implemented
MA0729 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $25,718 $11,750 Not Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented
MA0729 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,956 $3,300 Implemented
MA0729 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,114 $9,050 Not Implemented
MA0729 # 05 Y:2014 05 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,622 $2,690 Not Implemented
MA0729 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $200 Implemented
NC0499 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $2,055 $4,256 Implemented
NC0499 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $52,036 $15,000 Implemented
NC0499 # 02 Y:2013 02 2013 OPERATE BOILERS ON HIGH FIRE SETTING $17,607 $1,000 Implemented
NC0499 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,043 $0 Not Implemented
NC0499 # 04 Y:2013 04 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,670 $35,000 Not Implemented
NC0499 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $3,164 $1,617 Not Implemented
NC0499 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,539 $1,165 Not Implemented
NC0499 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $451 Implemented
NC0499 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $12,800 Implemented
NC0499 # 13 Y:2013 13 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $100 Implemented