IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

539

matching recommendations
Reset
NAICS 314 Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0278 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $1,289 $1,820 Not Implemented
SU0278 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,049 $6,721 Implemented
SU0278 # 09 Y:2009 09 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $112 $271 Not Implemented
SU0278 # 10 Y:2009 10 2009 OPTIMIZE PLANT POWER FACTOR $7,344 $28,458 Implemented
WV0387 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,474 $56,368 Implemented
WV0387 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,123 $12,560 Not Implemented
WV0387 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,978 $0 Implemented
WV0387 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,801 $1,480 Not Implemented
WV0387 # 05 Y:2009 05 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,208 $47 Not Implemented
WV0387 # 06 Y:2009 06 2009 OPTIMIZE PLANT POWER FACTOR $3,260 $4,450 Not Implemented
WV0387 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,818 $148 Implemented
WV0387 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $2,515 $651 Implemented
WV0387 # 09 Y:2009 09 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,292 $3,840 Not Implemented
WV0387 # 10 Y:2009 10 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,892 $0 Implemented
WV0387 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,753 $460 Not Implemented
WV0387 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,520 $28 Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $830 $1,094 Not Implemented
GT0846 # 04 Y:2008 04 2008 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,989 $26,900 Not Implemented
GT0846 # 05 Y:2008 05 2008 HEAT WATER WITH EXHAUST HEAT $551,313 $130,000 Not Implemented
GT0846 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $59,040 $65,000 Implemented
GT0846 # 07 Y:2008 07 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $155,720 $30,000 Implemented
GT0846 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,504 $70,103 Implemented
GT0846 # 09 Y:2008 09 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,206 $35,000 Not Implemented