Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
539
matching recommendationsNAICS | 314 | Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0580 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $611 | $0 | Not Implemented |
MA0580 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $444 | $0 | Not Implemented |
MA0580 # 09 Y:2005 | 09 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $312 | $0 | Not Implemented |
GT0808 # 01 Y:2005 | 01 | 2005 | REDUCE EXCESS STEAM BLEEDING | $205,920 | $22,000 | Not Implemented |
GT0808 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,498 | $0 | Implemented |
GT0808 # 03 Y:2005 | 03 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $7,554 | $3,000 | Not Implemented |
GT0808 # 04 Y:2005 | 04 | 2005 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $939 | $360 | Implemented |
GT0808 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,091 | $62,476 | Implemented |
GT0808 # 06 Y:2005 | 06 | 2005 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,309 | $15,800 | Not Implemented |
GT0808 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $255 | $350 | Implemented |
GT0808 # 08 Y:2005 | 08 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $5,317 | $0 | Not Implemented |
GT0804 # 01 Y:2005 | 01 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,261 | $1,200 | Not Implemented |
GT0804 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $289 | $500 | Implemented |
GT0804 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,926 | $12,224 | Implemented |
GT0804 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,306 | $75,000 | Not Implemented |
GT0804 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,432 | $2,500 | Implemented |
GT0804 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,303 | $1,600 | Implemented |
MA0569 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $67,271 | $331,800 | Not Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |
MA0569 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $1,082 | $494 | Implemented |
MA0569 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $5,248 | Implemented |
GT0796 # 01 Y:2004 | 01 | 2004 | COMBINE UTILITY METERS | $4,508 | $9,000 | Not Implemented |
GT0796 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $200 | Implemented |
GT0796 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $835 | $0 | Implemented |
GT0796 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $815 | $500 | Not Implemented |