Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
140
matching recommendationsNAICS | 314 | Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2203 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,941 | $13,595 | Implemented |
KS2203 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $98,216 | $570,000 | Implemented |
KS2203 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $45 | Implemented |
GT0931 # 09 Y:2019 | 09 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,800 | $554,400 | Not Implemented |
GT0931 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,292 | $3,500 | Implemented |
GT0931 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $2,451 | $1,382 | Implemented |
GT0931 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,194 | $25,005 | Implemented |
GT0931 # 04 Y:2019 | 04 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,893 | $19,194 | Not Implemented |
GT0931 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,664 | $4,500 | Implemented |
GT0931 # 06 Y:2019 | 06 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,047 | $39,068 | Not Implemented |
GT0931 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $111 | $322 | Implemented |
GT0931 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $34 | $131 | Implemented |
GT0921 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,972 | $32,568 | Not Implemented |
GT0921 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $1,446 | $1,974 | Not Implemented |
GT0921 # 01 Y:2019 | 01 | 2019 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $6,221 | $200 | Not Implemented |
GT0921 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $543 | $847 | Not Implemented |
GT0921 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $947 | $3,500 | Implemented |
GT0920 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $5,826 | $1,645 | Implemented |
GT0920 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,551 | $629 | Implemented |
GT0920 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,569 | $5,081 | Implemented |
GT0920 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,465 | $3,500 | Implemented |
GT0920 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $360 | $386 | Implemented |
TT0170 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,371 | $30,500 | Not Implemented |
TT0170 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,212 | $1,500 | Implemented |
TT0170 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,194 | $3,000 | Implemented |