Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsNAICS | 31499 | All Other Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0223 # 02 Y:2005 | 02 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,040 | $0 | Not Implemented |
SU0223 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,819 | $357 | Not Implemented |
SU0223 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $135 | Implemented |
SU0223 # 05 Y:2005 | 05 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,729 | $3,850 | Not Implemented |
SU0223 # 06 Y:2005 | 06 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $219 | $343 | Not Implemented |
SU0223 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $81 | $258 | Not Implemented |
GT0804 # 01 Y:2005 | 01 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,261 | $1,200 | Not Implemented |
GT0804 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $289 | $500 | Implemented |
GT0804 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,926 | $12,224 | Implemented |
GT0804 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,306 | $75,000 | Not Implemented |
GT0804 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,432 | $2,500 | Implemented |
GT0804 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,303 | $1,600 | Implemented |
MA0569 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $67,271 | $331,800 | Not Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |
MA0569 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $1,082 | $494 | Implemented |
MA0569 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $5,248 | Implemented |
WI0447 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $62,019 | $150,000 | Not Implemented |
WI0447 # 02 Y:2003 | 02 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $6,058 | $4,500 | Implemented |
WI0447 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,071 | $2,000 | Not Implemented |
WI0447 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $381 | $740 | Not Implemented |
WI0447 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,938 | $2,600 | Implemented |
TA0056 # 01 Y:2003 | 01 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $190,000 | $141,875 | Not Implemented |
TA0056 # 02 Y:2003 | 02 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $13,500 | $1,075 | Not Implemented |
TA0056 # 03 Y:2003 | 03 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,726 | $0 | Implemented |
TA0056 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $880 | $325 | Implemented |