Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 31499 | All Other Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2203 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,656 | $5,480 | Implemented |
KS2203 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $98,216 | $570,000 | Implemented |
KS2203 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $27,117 | $60,601 | Not Implemented |
KS2203 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,131 | $0 | Implemented |
KS2203 # 01 Y:2022 | 01 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,958 | $5,101 | Implemented |
KS2203 # 08 Y:2022 | 08 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,802 | $59,793 | Not Implemented |
KS2203 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $45 | Implemented |
KS2203 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,941 | $13,595 | Implemented |
GT0817 # 08 Y:2006 | 08 | 2006 | COMBINE UTILITY METERS | $1,987 | $0 | Not Implemented |
GT0817 # 01 Y:2006 | 01 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,981 | $1,333 | Implemented |
GT0817 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,933 | $164,201 | Not Implemented |
GT0817 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,177 | $9,625 | Not Implemented |
GT0817 # 04 Y:2006 | 04 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,469 | $7,920 | Not Implemented |
GT0817 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,652 | $500 | Implemented |
GT0817 # 06 Y:2006 | 06 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $2,666 | $1,500 | Implemented |
GT0817 # 07 Y:2006 | 07 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,042 | $15,000 | Not Implemented |
GT0814 # 02 Y:2005 | 02 | 2005 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $235,000 | $20,000 | Not Implemented |
GT0814 # 08 Y:2005 | 08 | 2005 | USE SYNTHETIC LUBRICANT | $3,800 | $0 | Not Implemented |
GT0814 # 03 Y:2005 | 03 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $85,200 | $10,000 | Not Implemented |
GT0814 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,500 | $82,400 | Not Implemented |
GT0814 # 05 Y:2005 | 05 | 2005 | DISCONNECT BALLASTS | $18,200 | $15,200 | Not Implemented |
GT0814 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $39,400 | $50,000 | Not Implemented |
GT0814 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,292 | $1,190 | Not Implemented |
GT0814 # 07 Y:2005 | 07 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,600 | $19,900 | Not Implemented |
GT0804 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,306 | $75,000 | Not Implemented |