IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0521 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $364,896 $1,350,000 Implemented
NC0521 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $57,030 $40,000 Implemented
NC0521 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,678 $40,000 Not Implemented
NC0521 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $41,376 $72,000 Not Implemented
NC0521 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,043 $5,100 Implemented
NC0521 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,870 $102,717 Implemented
NC0521 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,313 $650 Implemented
NC0521 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,162 $4,256 Implemented
NC0521 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $123,080 $103,307 Not Implemented
NC0381 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,192 $1,540 Not Implemented
NC0381 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,472 Not Implemented
NC0381 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,016 $100 Implemented
NC0381 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,183 $4,900 Not Implemented
NC0381 # 05 Y:2008 05 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $998 $500 Implemented
NC0381 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,224 $1,030 Implemented
NC0381 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $1,430 $800 Implemented
NC0381 # 02 Y:2008 02 2008 REPLACE BOILER $34,528 $60,000 Not Implemented
NC0381 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $80,420 $183,000 Not Implemented