IAC Assessment: NC0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Fabric for lingerie
NAICS 315190 - Other Apparel Knitting Mills
SIC 2254 - Knit Underwear Mills
Sales $50,000,000-$100,000,000
# of Employees 247
Plant Area (Sq.Ft.) 175,000
Annual Production 300,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $497,677 13,168,800 kWh $0.04
Electricity Demand $463,942 27,501 kW-months/year $16.87
Electricity Fees $3,480 - $ -
LPG $971,857 53,781 MMBtu $18.07
TOTAL ENERGY COSTS $1,936,956
RECOMMENDED SAVINGS* $641,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $455,314
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand LPG Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$123,080
Cost:
$103,307
$10,699 283,049 $6,851 406 $105,530 5,840 - - - - $10,699
283,049
kWh
$6,851
406
kW-months/year
$105,530
5,840
MMBtu
-
-
Tgal
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$364,896
Cost:
$1,350,000
- - - - $69,410 3,841 $22,182 9,320 $273,304 - -
-
kWh
-
-
kW-months/year
$69,410
3,841
MMBtu
$22,182
9,320
Tgal
$273,304
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$57,030
Cost:
$40,000
- - $57,030 3,856 - - - - - - -
-
kWh
$57,030
3,856
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$21,678
Cost:
$40,000
- - - - $21,678 1,200 - - - - -
-
kWh
-
-
kW-months/year
$21,678
1,200
MMBtu
-
-
Tgal
-
-
$
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$41,376
Cost:
$72,000
$14,311 378,600 $27,065 1,604 - - - - - - $14,311
378,600
kWh
$27,065
1,604
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,043
Cost:
$5,100
$1,080 28,560 $963 57 - - - - - - $1,080
28,560
kWh
$963
57
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,870
Cost:
$102,717
$11,679 308,977 $9,298 551 - - - - $5,893 - $11,679
308,977
kWh
$9,298
551
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,893
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,313
Cost:
$650
$2,313 61,182 - - - - - - - - $2,313
61,182
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,162
Cost:
$4,256
$1,142 30,221 $1,020 60 - - - - - - $1,142
30,221
kWh
$1,020
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$641,448
Cost:
$1,718,030
$41,224 1,090,589 $102,227 6,534 $196,618 10,881 $22,182 9,320 $279,197 - $41,224
1,090,589
kWh
$102,227
6,534
kW-months/year
$196,618
10,881
MMBtu
$22,182
9,320
Tgal
$279,197
-
$
TOTAL IMPLEMENTED Savings:
$455,314
Cost:
$1,502,723
$16,214 428,940 $68,311 4,524 $69,410 3,841 $22,182 9,320 $279,197 - $16,214
428,940
kWh
$68,311
4,524
kW-months/year
$69,410
3,841
MMBtu
$22,182
9,320
Tgal
$279,197
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand LPG Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand LPG Water Disposal Ancillary Material Cost