IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1510 # 12 Y:2015 12 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $310 $90 Implemented
UK1510 # 11 Y:2015 11 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $427 $273 Implemented
UK1510 # 10 Y:2015 10 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $305 $886 Not Implemented
UK1510 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $445 $650 Not Implemented
UK1510 # 08 Y:2015 08 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $623 $2,031 Not Implemented
UK1510 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $849 $0 Not Implemented
UK1510 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,236 $0 Implemented
UK1510 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,527 $2,143 Implemented
UK1510 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,187 $2,890 Implemented
UK1510 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,580 $2,360 Implemented
UK1510 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $3,354 $750 Implemented
UK1510 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $10,047 $6,250 Not Implemented
NC0547 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $675 $200 Implemented
NC0547 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,570 $50,000 Not Implemented
NC0547 # 12 Y:2015 12 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $231 $1,000 Implemented
NC0547 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,688 $281 Implemented
NC0547 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $2,028 $4,256 Implemented
NC0547 # 09 Y:2015 09 2015 REDESIGN PROCESS $461 $2,000 Not Implemented
NC0547 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $88 $100 Not Implemented
NC0547 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $883 $500 Not Implemented
NC0547 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,433 $11,840 Implemented
NC0547 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $3,947 $2,800 Implemented
NC0547 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $675 $1,800 Not Implemented
NC0547 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $100 Implemented
NC0547 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,024 $100 Not Implemented