Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Socks |
NAICS | 315110 - Hosiery and Sock Mills |
SIC | 2252 - Hosiery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 450,000 |
Annual Production | 46,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $440,640 | 8,819,850 | kWh | $0.05 |
Electricity Demand | $178,876 | 20,924 | kW-months/year | $8.55 |
Natural Gas | $309,821 | 50,820 | MMBtu | $6.10 |
TOTAL ENERGY COSTS | $929,337 | |||
RECOMMENDED SAVINGS* | $56,128 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,427 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $33,570 Cost: $50,000 |
$33,570 | 671,400 | - | - | - | - | - | - | - | - |
$33,570 671,400 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,024 Cost: $100 |
$4,489 | 89,776 | $1,535 | 180 | - | - | - | - | - | - |
$4,489 89,776 kWh |
$1,535 180 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,425 Cost: $100 |
$3,223 | 64,454 | $1,102 | 129 | - | - | $(-600) | - | $(-300) | - |
$3,223 64,454 kWh |
$1,102 129 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $675 Cost: $1,800 |
$675 | 13,508 | - | - | - | - | - | - | - | - |
$675 13,508 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,947 Cost: $2,800 |
- | - | - | - | $3,947 | 647 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,947 647 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $2,433 Cost: $11,840 |
- | - | - | - | $3,100 | 508 | $(-667) | - | - | - |
- - kWh |
- - kW-months/year |
$3,100 508 MMBtu |
$(-667) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $883 Cost: $500 |
$578 | 11,550 | $226 | 26 | - | - | - | - | $79 | - |
$578 11,550 kWh |
$226 26 kW-months/year |
- - MMBtu |
- - $ |
$79 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $88 Cost: $100 |
$88 | 1,760 | - | - | - | - | - | - | - | - |
$88 1,760 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.5194 REDESIGN PROCESS |
Savings: $461 Cost: $2,000 |
$99 | 1,971 | $23 | 3 | - | - | $200 | - | $139 | - |
$99 1,971 kWh |
$23 3 kW-months/year |
- - MMBtu |
$200 - $ |
$139 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,028 Cost: $4,256 |
$1,511 | 30,221 | $517 | 60 | - | - | - | - | - | - |
$1,511 30,221 kWh |
$517 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,688 Cost: $281 |
$1,258 | 25,154 | $430 | 50 | - | - | - | - | - | - |
$1,258 25,154 kWh |
$430 50 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $231 Cost: $1,000 |
$187 | 3,738 | $44 | 5 | - | - | - | - | - | - |
$187 3,738 kWh |
$44 5 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $675 Cost: $200 |
$412 | - | $263 | 37 | - | - | - | - | - | - |
$412 - kWh |
$263 37 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,128 Cost: $74,977 |
$46,090 | 913,532 | $4,140 | 490 | $7,047 | 1,155 | $(-1,067) | - | $(-82) | - | $46,090 913,532 kWh |
$4,140 490 kW-months/year |
$7,047 1,155 MMBtu |
$(-1,067) - $ |
$(-82) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,427 Cost: $20,477 |
$6,591 | 123,567 | $2,356 | 281 | $7,047 | 1,155 | $(-1,267) | - | $(-300) | - | $6,591 123,567 kWh |
$2,356 281 kW-months/year |
$7,047 1,155 MMBtu |
$(-1,267) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |