IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 31511 Hosiery and Sock Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0505 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,993 $319 Implemented
NC0505 # 06 Y:2014 06 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,874 $200 Implemented
NC0505 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $1,108 $100 Implemented
NC0505 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,186 $100 Implemented
NC0505 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $33,641 $67,830 Not Implemented
NC0505 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,010 $20,000 Not Implemented
NC0505 # 01 Y:2014 01 2014 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,293 $200 Implemented
NC0474 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $100 Implemented
NC0474 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $13,419 $5,700 Implemented
NC0474 # 07 Y:2013 07 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,656 $25,000 Not Implemented
NC0474 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,431 $1,000 Implemented
NC0474 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,019 $3,470 Implemented
NC0474 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $3,817 $7,000 Not Implemented
NC0474 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $1,180 Implemented
NC0474 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,365 $52,188 Implemented
NC0474 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $93,874 $176,250 Implemented
NC0342 # 08 Y:2006 08 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,537 $0 Not Implemented
NC0342 # 07 Y:2006 07 2006 INSULATE FEEDWATER TANK $676 $1,087 Not Implemented
NC0342 # 06 Y:2006 06 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $4,323 $1,000 Implemented
NC0342 # 05 Y:2006 05 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,986 $1,250 Not Implemented
NC0342 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $935 $100 Implemented
NC0342 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $592 $1,000 Implemented
NC0342 # 02 Y:2006 02 2006 TREAT AND REUSE RINSE WATERS $6,045 $17,292 Not Implemented
NC0342 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,717 $12,000 Not Implemented
NC0330 # 08 Y:2005 08 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,180 $3,964 Implemented