IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
NAICS 321 Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0258 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,092 $6,400 Not Implemented
LE0258 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $12,411 $18,750 Not Implemented
LE0258 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,871 $10,000 Not Implemented
LE0258 # 04 Y:2007 04 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,874 $5,000 Not Implemented
LE0258 # 05 Y:2007 05 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $767 $150 Not Implemented
LE0258 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,367 $40,684 Not Implemented
LE0258 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $387 $1,400 Not Implemented
OR0516 # 01 Y:2007 01 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,800 $0 Not Implemented
OR0516 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,100 $37,100 Implemented
OR0516 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,600 $15,300 Implemented
OR0516 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $5,300 $7,800 Implemented
OR0516 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,400 $9,800 Implemented
OR0516 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $2,800 $13,200 Not Implemented
OR0516 # 07 Y:2007 07 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,300 $26,900 Not Implemented
UA0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $252 Not Implemented
UA0001 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,116 $3,113 Not Implemented
UA0001 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,151 $64 Not Implemented
UA0001 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,147 $3,013 Not Implemented
UA0001 # 05 Y:2007 05 2007 $31,200 $8,489 Not Implemented
UA0001 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $564 $1,110 Not Implemented
UA0001 # 07 Y:2007 07 2007 RECOVER AND REUSE WASTE MATERIAL $6,000 $0 Not Implemented
MS0309 # 01 Y:2007 01 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $399,965 $2,750,000 Not Implemented
MS0309 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,357 $7,875 Implemented
MS0309 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,962 $156 Implemented
MS0309 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,297 $2,981 Implemented