IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0708 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,444 $8,480 Not Implemented
OR0708 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,132 $0 Not Implemented
OR0708 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $12,870 $46,694 Not Implemented
OR0708 # 01 Y:2018 01 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,920 $18,036 Not Implemented
BS0112 # 06 Y:2018 06 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,051 $2,790 Not Implemented
BS0112 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $16,656 $1,031 Not Implemented
BS0112 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,785 $1,560 Not Implemented
BS0112 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,787 $13,000 Not Implemented
BS0112 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,971 $2,145 Not Implemented
BS0112 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,983 $1,500 Not Implemented
OK0990 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,502 $378 Implemented
OK0990 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,588 $15,600 Not Implemented
OK0990 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,553 $7,440 Implemented
OK0990 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $2,329 Not Implemented
OK0990 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $11,191 $20,591 Not Implemented
BS0109 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,902 $6,720 Not Implemented
BS0109 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $122 $39 Not Implemented
BS0109 # 05 Y:2018 05 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $169 $25 Not Implemented
BS0109 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,601 $1,491 Not Implemented
BS0109 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,480 $10,867 Not Implemented
AM0744 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,640 $0 Implemented
AM0744 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,150 $5,000 Implemented
AM0744 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,840 $225 Not Implemented
AM0744 # 05 Y:2018 05 2018 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,800 $0 Implemented
AM0744 # 01 Y:2018 01 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,930 $4,570 Implemented