IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0263 # 09 Y:2022 09 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,119 $5,072 Implemented
UA0263 # 08 Y:2022 08 2022 USE PHOTOCELL CONTROLS $1,182 $2,240 Implemented
UA0263 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,323 $3,005 Implemented
UA0263 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $12,543 $6,630 Implemented
UA0263 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,315 $800 Not Implemented
UA0263 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,283 $500 Not Implemented
UA0263 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,564 $3,635 Implemented
UA0263 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $75,936 $24,406 Implemented
UA0263 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $474,477 $2,321,152 Not Implemented
OR0755 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $13,297 $55,141 Not Implemented
OR0755 # 07 Y:2022 07 2022 REPLACE BOILER $3,641,663 $6,124,080 Not Implemented
OR0755 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,503 $23,536 Not Implemented
OR0755 # 04 Y:2022 04 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,507,357 $45,058 Not Implemented
OR0755 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,555 $0 Not Implemented
OR0755 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,881 $0 Not Implemented
OR0755 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,233 $0 Not Implemented
LE0519 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $971 $25 Implemented
LE0519 # 06 Y:2022 06 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,038 $57,000 Not Implemented
LE0519 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,082 $16,800 Implemented
LE0519 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $835 $1,670 Implemented
LE0519 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,358 $85,000 Not Implemented
LE0519 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,000 Implemented