IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 321114 Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0132 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $1,522 Implemented
UA0132 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,339 $50 Implemented
UA0132 # 06 Y:2014 06 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,554 $6,336 Not Implemented
UA0132 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,665 $10,900 Not Implemented
UA0132 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,531 $10,336 Not Implemented
UA0132 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,414 $0 Not Implemented
UA0132 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $4,189 $1,583 Implemented
UA0132 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,943 $13,395 Not Implemented
UA0128 # 04 Y:2014 04 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $11,022 $7,500 Not Implemented
UA0128 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $605 $1,725 Implemented
UA0128 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,158 $7,334 Not Implemented
UA0128 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,565 $6,495 Implemented
UA0128 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,193 $6,764 Not Implemented
UA0128 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,032 $35,000 Not Implemented
UA0128 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $24,552 $12,050 Not Implemented
UA0128 # 01 Y:2014 01 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $125,709 $180,000 Not Implemented
MS0345 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,308 $7,084 Not Implemented
MS0345 # 09 Y:2009 09 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $330 $168 Implemented
MS0345 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $948 $864 Implemented
MS0345 # 07 Y:2009 07 2009 USE PHOTOCELL CONTROLS $1,095 $630 Not Implemented
MS0345 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $12,190 Not Implemented
MS0345 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,379 $462 Implemented
MS0345 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,977 $4,445 Implemented
MS0345 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,762 $10,935 Not Implemented
MS0345 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,965 $187 Implemented