IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0564 # 01 Y:2010 01 2010 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $11,375 $32,340 Not Implemented
OR0564 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,314 $31,314 Implemented
OR0564 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $9,666 $40,000 Not Implemented
OR0564 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,849 $7,575 Not Implemented
OR0564 # 05 Y:2010 05 2010 USE OPTIMUM THICKNESS INSULATION $64,658 $105,222 Implemented
OR0564 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $7,248 $31,290 Not Implemented
NC0416 # 01 Y:2010 01 2010 KEEP BOILER TUBES CLEAN $359,066 $411,700 Not Implemented
NC0416 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,117 $50 Implemented
NC0416 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,948 $100 Implemented
NC0416 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,462 $6,800 Not Implemented
NC0416 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,679 $30,438 Not Implemented
NC0416 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $568 Implemented
NC0416 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $415 $949 Implemented
DL0059 # 01 Y:2010 01 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,800 $520 Implemented
DL0059 # 02 Y:2010 02 2010 USE COMPRESSOR AIR FILTERS $6,340 $12,965 Implemented
DL0059 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $7,300 $650 Not Implemented
DL0059 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,931 $40 Implemented
DL0059 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,616 $400 Implemented
DL0059 # 06 Y:2010 06 2010 INSTALL TIMERS AND/OR THERMOSTATS $2,552 $1,038 Implemented
DL0059 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $580 $40 Implemented
OR0555 # 01 Y:2010 01 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $257,883 $405,450 Not Implemented
OR0555 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $32,115 $37,100 Not Implemented
OR0555 # 03 Y:2010 03 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,978 $11,900 Implemented
OR0555 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $1 Implemented
WV0399 # 01 Y:2010 01 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $215,411 $540,000 Not Implemented