IAC Assessment: NC0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Wood door skins
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,099,746 34,441,200 kWh $0.03
Electricity Demand $500,257 57,183 kW-months/year $8.75
Natural Gas $398,965 65,297 MMBtu $6.11
Wood $1 336,000 MMBtu $0.00
TOTAL ENERGY COSTS $1,998,969
RECOMMENDED SAVINGS* $1,069,661 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $725,503
#|Description Savings
Cost
Status Natural Gas Personnel Changes Ancillary Material Cost Natural Gas Personnel Changes Ancillary Material Cost
$ MMBtu $ $ $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$155,882
Cost:
$10,000
$155,882 25,512 - - - - $155,882
25,512
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$209,278
Cost:
$1,200
$209,278 34,250 - - - - $209,278
34,250
MMBtu
-
-
$
-
-
$
03: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$164,666
Cost:
$20,000
$164,666 26,950 - - - - $164,666
26,950
MMBtu
-
-
$
-
-
$
04: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$104,205
Cost:
$18,000
$104,205 17,055 - - - - $104,205
17,055
MMBtu
-
-
$
-
-
$
05: 2.2126 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) Savings:
$178,345
Cost:
$50,000
$178,345 29,189 - - - - $178,345
29,189
MMBtu
-
-
$
-
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$10,000
Cost:
$200
$10,000 1,637 - - - - $10,000
1,637
MMBtu
-
-
$
-
-
$
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$3,200
Cost:
$1,200
$3,200 523 - - - - $3,200
523
MMBtu
-
-
$
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,000
Cost:
$600
- - $2,500 - $500 - -
-
MMBtu
$2,500
-
$
$500
-
$
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$106,205
Cost:
$1,200
$104,205 17,055 - - $2,000 - $104,205
17,055
MMBtu
-
-
$
$2,000
-
$
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$5,500
Cost:
$150
$5,500 900 - - - - $5,500
900
MMBtu
-
-
$
-
-
$
11: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,500
Cost:
$1,050
$500 82 $2,000 - - - $500
82
MMBtu
$2,000
-
$
-
-
$
12: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$126,880
Cost:
$500,000
$112,880 18,475 $10,000 - $4,000 - $112,880
18,475
MMBtu
$10,000
-
$
$4,000
-
$
TOTAL RECOMMENDED Savings:
$1,069,661
Cost:
$603,600
$1,048,661 171,628 $14,500 - $6,500 - $1,048,661
171,628
MMBtu
$14,500
-
$
$6,500
-
$
TOTAL IMPLEMENTED Savings:
$725,503
Cost:
$101,200
$720,503 117,921 $2,500 - $2,500 - $720,503
117,921
MMBtu
$2,500
-
$
$2,500
-
$
Savings
Cost
$ MMBtu $ $ $ $
Natural Gas Personnel Changes Ancillary Material Cost Natural Gas Personnel Changes Ancillary Material Cost