IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 32121 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0020 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $140,348 $663,784 n/a
SJ0020 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,868 $15,989 n/a
SJ0020 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,898 $9,577 n/a
SJ0020 # 07 Y:2024 07 2024 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,380 $0 n/a
SJ0020 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,851 $0 n/a
SJ0020 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $0 n/a
SJ0020 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $178 $770 n/a
SJ0020 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $156 $358 n/a
SJ0014 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $22,822 $3,080 Not Implemented
SJ0014 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,018 $0 Not Implemented
SJ0014 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,050 $51 Implemented
SJ0014 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,211 $1,240 Not Implemented
SJ0014 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,864 $4,784 Not Implemented
SJ0014 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,454 $17,634 Not Implemented
SJ0014 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $427,760 $693,530 Not Implemented
SJ0014 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $336 Not Implemented
SD0482 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,350 Not Implemented
SD0482 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $881 $855 Not Implemented
SD0482 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $960 $2,575 Implemented
SD0482 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $1,780 $3,145 Implemented
SD0482 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,705 $900 Implemented
OR0623 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,460 $11,957 Not Implemented
OR0623 # 04 Y:2013 04 2013 MODIFY STARTUP/SHUTDOWN TIMES $2,617 $2,500 Not Implemented
OR0623 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $6,693 $1,500 Implemented
OR0623 # 02 Y:2013 02 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,199 $1,260 Not Implemented