Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 32121 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0761 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,236 $26,406 Not Implemented
OR0761 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $31,013 $150,000 Not Implemented
UA0260 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,881 $1,000 Not Implemented
UA0260 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,710 $1,651 Implemented
UA0260 # 03 Y:2022 03 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $429,299 $2,825,211 Not Implemented
UA0260 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $230,787 $328,350 Not Implemented
UA0260 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $90,617 $35,347 Implemented
UA0260 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,000 $1,784 Not Implemented
UA0259 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $50,082 $26,090 Implemented
UA0259 # 04 Y:2022 04 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $225,594 $969,631 Not Implemented
UA0259 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $100,047 $47,295 Not Implemented
UA0259 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,057 $2,063 Not Implemented
UA0259 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,827 $1,000 Implemented
OR0750 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Not Implemented
OR0750 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $49,792 $155,954 Not Implemented
OR0750 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87,087 $87,086 Not Implemented
OR0750 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $149,543 $65,909 Not Implemented
OR0750 # 03 Y:2022 03 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,591 $4,338 Not Implemented
OR0750 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,607 $0 Not Implemented
AS0515 # 01 Y:2022 01 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $125,792 $20,098 Implemented
AS0515 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $30,224 $146,764 Not Implemented
AS0515 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,340 $9,935 Not Implemented
AS0515 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,528 $28,033 Implemented