IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

971

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0501 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,534 $26,699 Not Implemented
WV0501 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,928 $1,000 Implemented
WV0501 # 04 Y:2015 04 2015 REPAIR OR REPLACE STEAM TRAPS $3,486 $5,200 Implemented
WV0501 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,359 $0 Not Implemented
WV0501 # 06 Y:2015 06 2015 REPAIR AND ELIMINATE STEAM LEAKS $2,432 $400 Implemented
WV0501 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,751 $7,185 Not Implemented
WV0501 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $1,262 $2,533 Not Implemented
WV0501 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $1,062 $649 Implemented
WV0501 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $327 Implemented
UD0915 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
UD0915 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,184 $1,200 Implemented
UD0915 # 03 Y:2014 03 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,714 $1,800 Implemented
UD0915 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,815 $100 Implemented
UD0915 # 05 Y:2014 05 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,180 $700 Not Implemented
UD0915 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,210 $23,600 Not Implemented
UD0915 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $993 $2,575 Not Implemented
UD0915 # 08 Y:2014 08 2014 COVER OPEN TANKS $14,519 $39,186 Not Implemented
UD0915 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129,321 $377,745 Not Implemented
UD0915 # 10 Y:2014 10 2014 ADD AREA LIGHTING SWITCHES $117 $0 Not Implemented
UD0915 # 11 Y:2014 11 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,301 $0 Not Implemented
WM0057 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,391 $35,000 Not Implemented
WM0057 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,441 $4,500 Not Implemented
WM0057 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $133 $122 Not Implemented
WM0057 # 04 Y:2014 04 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,200 $0 Not Implemented
WM0057 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,235 $2,200 Not Implemented