IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

971

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0049 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,995 $44,750 Not Implemented
WM0049 # 04 Y:2014 04 2014 USE POWER DURING OFF-PEAK PERIODS $1,567 $0 Implemented
WM0049 # 05 Y:2014 05 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,012 $2,000 Not Implemented
WM0049 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $940 $760 Not Implemented
WM0049 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,676 $9,434 Not Implemented
WM0049 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $5,348 Not Implemented
WM0049 # 09 Y:2014 09 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,969 $41,765 Implemented
WM0049 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,788 $1,290 Implemented
WM0049 # 11 Y:2014 11 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,253 $3,096 Implemented
WM0049 # 12 Y:2014 12 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,231 $200,000 Not Implemented
UM0442 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $143,338 $477,600 Not Implemented
UM0442 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,315 $40,000 Implemented
UM0442 # 03 Y:2014 03 2014 USE MINIMUM STEAM OPERATING PRESSURE $10,229 $5,000 Implemented
UM0442 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $4,900 $3,000 Implemented
MA0718 # 01 Y:2013 01 2013 BURN WOOD BY-PRODUCTS FOR HEAT $37,299 $200,000 Not Implemented
MA0718 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,029 $1,000 Implemented
MA0718 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,409 $26,750 Not Implemented
MA0718 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $809 $1,400 Implemented
MA0718 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $200 Implemented
TT0118 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $534 $125 Not Implemented
TT0118 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,441 $130,082 Not Implemented
TT0118 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,125 $2,927 Implemented
TT0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,461 $800 Implemented
MI0248 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,983 $30,489 Implemented
MI0248 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,449 $2,300 Implemented