IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0656 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,997 $1,500 Implemented
WV0656 # 01 Y:2023 01 2023 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $114,700 $500,000 Not Implemented
WV0656 # 11 Y:2023 11 2023 DEVELOP A REPAIR/REPLACE POLICY $1,896 $8,107 Implemented
WV0656 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,471 $75,000 Not Implemented
WV0656 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $8,319 $1,861 Implemented
WV0656 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,117 $9,888 Implemented
WV0656 # 05 Y:2023 05 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,882 $17,230 Not Implemented
WV0656 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,912 $637 Implemented
WV0656 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $2,669 $13,005 Not Implemented
WV0656 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,265 $1,350 Implemented
WV0656 # 14 Y:2023 14 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,191 $1,070 Implemented
WV0656 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $3,448 $14,655 Not Implemented
WV0656 # 12 Y:2023 12 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,376 $1,500 Implemented
WV0656 # 13 Y:2023 13 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,364 $3,507 Implemented
WV0655 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,078 $12,517 Implemented
WV0655 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $8,192 $5,240 Implemented
WV0655 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $6,154 $4,905 Not Implemented
WV0655 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,350 $1,500 Implemented
WV0655 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $11,948 $11,050 Not Implemented
WV0655 # 01 Y:2023 01 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $50,347 $17,230 Not Implemented
WV0655 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $324 $359 Implemented
WV0655 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,005 $7,828 Implemented
WV0655 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $39,676 $165,000 Not Implemented
WV0655 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,873 $10,662 Not Implemented
WV0655 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,641 $210 Implemented